Objective
Treat the sewage water, deminiralize other water for powerplant use, and also provide suitable drinking water.
Solution
This project is a complete package which consists of Sewage Treatment Plant, Water Treatment Plant and Demineralization system for power plant #10 in Riyadh.
The main target of this project is to provide the required water (quality & quantity) for the the power generation purposes with maximum conductivity of 1 uS/cm for the boiler feed water (2 x 360 m3/day). Moreover, the plant produces the required water for the drinking purposes as per the client standards and requirements ( 2 x 480 m3/day).