Objective
Build offices, storage facilities, and the infrastructure for pumping and treatment stations to be installed.
Solution
The existing RO system of Jeddah Industrial City consist of two train with two stages each, the first stage in each train contains 30 pressure vessels with 6 (BW30-365 FR) elements each, and the second stage contains 17 pressure vessels with 6 (BW30- 365 FR) elements each.