Lavender Apartments

Objective Build a fenced apartment complex with garden and play area for children in the Bekaa valley of Lebanon. Solution From the very beginning plans and ideas were made and revised in order to provide the best comfort for residents of Lavender. So we decided to move the buildings as far back as possible from all public roads, this ensures …

WETICO Building

Objective Complete the finishing works on the new office building in a year timespan. Solution Careful and proper planning had to be taken into consideration to complete the 3,000sqm building in such a timeframe.  

Aflaj Farms

Objective Build 36 poultry farms in a distant remote area in Aflaj overcoming terrain conditions. Solution Careful and proper planning had to be taken into consideration to erect over 50,000m2 in farms in pure dessert. Obstacles from all aspects when working in remote locations had to be overcome, from transportation of heavy equipment, to power and water requirements. And with …

Al Marai

Objective Build offices, storage facilities, and the infrastructure for pumping and treatment stations to be installed. Solution The existing RO system of Jeddah Industrial City consist of two train with two stages each, the first stage in each train contains 30 pressure vessels with 6 (BW30-365 FR) elements each, and the second stage contains 17 pressure vessels with 6 (BW30- …